Rhino Resources 3D Seismic Survey in PEL0085/Block 2914A, offshore southern Namibia

15 June 2026 | Client: Rhino Resources Namibia Ltd

Rhino Resources Namibia Ltd (Rhino) and its Joint Venture (JV) partners, Azule Energy Exploration Angola Limited, NAMCOR and Korres Investments (Pty) Ltd, are the joint holders of a Petroleum Exploration Licence (PEL0085) over Block 2914A, located off the southern coast of Namibia. The Block covers an area of 5 338 square kilometres in extent and is located ~148 km from Oranjemund and ~260 km from Lüderitz, in water depths ranging from 200 m to 1 800 m.

Based on the exploration results to date, Rhino and its JV partners are proposing to undertake 3D seismic surveying activities across PEL0085/Block 2914A. The proposed survey area will extend beyond the Block boundary. Up to 8 seismic campaigns are proposed from 2026/27 to 2029/30, with each campaign being~2.5 to 3 months in duration.

The proposed project triggers several listed activities in terms of the Environmental Impact Assessment (EIA) Regulations 2012, and as such requires an Environmental Clearance Certificate (ECC) from the Ministry of Environment, Forestry and Tourism (MEFT) before these activities can commence. As part of this process, an Environmental and Social Impact Assessment (ESIA) must be undertaken. SLR Environmental Consulting (Namibia) (Pty) Ltd (SLR) has been appointed as the independent Environmental Assessment Practitioner (EAP) to manage the ECC application and to undertake the ESIA process.

Status

The Draft ESIA Scoping Report has been compiled and distributed for public review and comment until 15 July 2026. Interested and Affected Parties (I&APs) are invited to comment on any aspect of the proposed project and ESIA process, and findings thereof. A copy of the full report, as well as a Non-Technical Summary (NTS) are available for download below.

Any comments should be sent to SLR using the online form (https://forms-office-com-slrpublicdocs.datafree.co/e/LH8Mr3c2fg) or by contacting SLR using the details listed above. For comments to be included in the Final ESIA Scoping Report, they should reach SLR by no later than 15 July 2026.

All I&APs are invited to attend one of the upcoming public meetings as advertised in the below documents for download below. The Draft ESIA Scoping Report and include details of the planned meeting dates, venues and times.